    GSA Data Center                LAKEWOOD, CO

    KTA Group provided mechanical, electrical and plumbing engineering services for this new 110,000 square foot data center at the Denver Federal Center in Denver , Colorado. The project was completed under the design/build construction model with a total construction budget of over $62,000,000. The facility consists of two stories with a mechanical basement, totaling 110,000 gross square feet. The Tier III facility, as rated by the Uptime Institute Tier Level Classification System, will contain redundancy for failure and maintenance and employs the Performance Optimized Datacenter (POD) concept. Design began in March 2010 and was completed in January, 2012. This project is funded by the FY2009 American Recovery and Reinvestment Act, and is recognized under the prestigious GSA Design and Construction Excellence Program. This project earned a LEED Gold rating from USGBC.

    Architect: HGA